It does various feasibility studies. In these studies a rough figure of the system activities can be obtained, from which the decision about the strategies to be followed for effective system study and analysis can be taken. Crime File System 6 2. The proposed system can overcome all the limitations of the existing system. The system provides proper security and reduces the manual work. Feasibility study lets the developer foresee the future of the project and the usefulness.

A feasibility study of a system proposal is according to its workability, which is the impact on the organization, ability to meet their user needs and effective use of resources. Thus when a new application is proposed it normally goes through a feasibility study before it is approved for development.

The document provide the feasibility of the project that is being designed and lists various areas that were considered very carefully during the feasibility study of this project such as Technical, Economic and Operational feasibilities. The following are its features: A. The assessment of this feasibility must be based on an outline design of the system requirement in the terms of input, output, programs and procedures. Having identified an outline system, the investigation must go on to suggest the type of equipment, required method developing the system, of running the system once it has been designed.

The project should be developed such that the necessary functions and performance are achieved within the constraints. The project is developed within latest technology.

Through the technology may become obsolete after some period of time, due to the fact that never version of same software supports older versions, the system may still be used. So there are minimal constraints involved with this project. The system has been developed using Java the project is technically feasible for development.

Criteria to ensure that effort is concentrated on project, which will give best, return at the earliest. One of the factors, which affect the development of a new system, is the cost it would require.

Since the system is developed as part of project work, there is no manual cost to spend for the proposed system. Also all the resources are already available, it give an indication of the system is economically possible for development. The project would be beneficial because it satisfies the objectives when developed and installed.

All behavioral aspects are considered carefully and conclude that the project is behaviorally feasible. Design is a creative process. A good design is the key to effective system. It may be defined as a process of applying various techniques and principles for the purpose of defining a device, a process or a system in sufficient detail to permit its physical realization.

Software design sits at the technical kernel of the software engineering process and is applied regardless of the development paradigm that is used. The system design develops the architectural detail required to build a system or product. As in the case of any systematic approach, this software too has undergone the best possible design phase fine tuning all efficiency, performance and accuracy levels.

The design phase is a transition from a user oriented document to a document to the programmers or database personnel.

The input is designed in such a way so that it provides security and ease of use with retaining the privacy. Input Design considered the following things: o What data should be given as input? In output design it is determined how the information is to be displaced for immediate need and also the hard copy output. It is the most important and direct source information to the user.

Designing computer output should proceed in an organized, well thought out manner; the right output must be developed while ensuring that each output element is designed so that people will find the system can use easily and effectively.

The data is the purpose of any database and must be protected. The database design is a two level process. In the first step, user requirements are gathered together and a database is designed which will meet these requirements as clearly as possible. In the second step, this Information level design is transferred into a design for the specific DBMS that will be used to implement the system in question.

A database design runs parallel with the system design. The organization of the data in the database is aimed to achieve the following two major objectives.

Normalization is carried out in this system for the following reasons. Each relation resembles a table of values or file of records. In formal relational model terminology, a row is called a tuple, a column header is called an attribute and the table is called a relation. A relational database consists of a collection of tables, each of which is assigned a unique name.

A row in a tale represents a set of related values. The rows in a table are called tuples. A tuple is an ordered set of n elements. Columns are referred to as attributes. Relationships have been set between every table in the database. This ensures both Referential and Entity Relationship Integrity. A domain D is a set of atomic values. A common method of specifying a domain is to specify a data type from which the data values forming the domain are drawn.

It is also useful to specify a name for the domain to help in interpreting its values. Every value in a relation is atomic, that is not decomposable. Share Projects. Share Ideas. My Project. Project of the Day. About Project project information Issues Ask Question to developers. How To Import Database? Project of the Month. Criminal File errors and issues. Load More. Issues Title. Issues Description. You may like a project. Rate and Reviews 1. Latest VB project VB project.

VB project. Write a review. Download Code 0. Download Report 0 MB. The machine can print out 2, tickets, including the journey report. It would also help in providing adequate data to the corporation, particularly with regard to the boarding of passengers from fare stages and important points.

This would help the corporation prepare and organize its schedules more efficiently on the basis of traffic demand. Financial Management System Description : Financial Management System is a effective software for handling the financial activities of a firm.

Here this financial management system is an ultimate solution for a bank and simillar institutions Technology : System, V B View Abstract : detailed abstract. Hospital Management System Description : Its very useful software for hospital administration.

It can use at Clinics, Nursing Homes as well as Hospitals. It includes the modules like patient and doctors details and other administration activities Technology : System,VB View Abstract : detailed abstract.

MorpheusSoft Description : Morphing is the process of transforming one image to another. This software is easy to use for the beginners, but full of many advanced options for complicated morphs. This program can morph one image to another or add effects to one picture.

Offline Examiner. Description :. Offline examiner is a real time project. The project will be implemented using VB.